Vf series, General pump, Screw calibration – General Pump VF Repair Manual User Manual
Page 18
GENERAL PUMP
A member of the Interpump Group
VF SERIES
Page 18
3. SCREW CALIBRATION
Screw calibration by means of a torque wrench only.
Screw 44 and 57 of the exploded view, should be greased before being tightened by
means of a torque wrench.
Description
Exploded View Position
(From Owner’s Manual)
Fastening Torque
(Ft. Lbs.)
Fastening Torque
(Nm)
Cover fastening screws
19
7.4
10
Oil discharge plug
11
29.5
40
Lifting bracket fastening screw
17
73.8
100
Conrod caps fastening screw
18
28
38*
Plunger fastening
28
14.8
20
Choke
31
7.4
10
Support fastening screw
44
11
15****
Head fastening screw
56
59
80**
Liner fastening screw
57
25.8
35***
Hydraulic motor flange screw
59
29.5
40
* The conrod caps fastening screws must be tighteded respecting the phases indicated in “Point D”
of page 6
** The head fastening screws must be tightened respecting the phases and the order indicated in fig. 45
*** The liner fastening screws must be tightened respecting the phases and the order indicated in fig. 45
****The support fastening screws must be tightened in a single step, respecting the order indicated
in fig. 44