I. final checklist – Hoshizaki KMH-2000SWH/3 User Manual
Page 28
28
I. Final Checklist
WARNING
CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews are
securely in place after installation. Make sure that none have fallen into the
storage bin.
1) Is the icemaker level?
2) Is the icemaker in a site where the ambient temperature is within 45°F to 100°F (7°C to
38°C) and the water temperature within 45°F to 90° (7°C to 32°C) all year around?
3) Is there at least 6" (15 cm) clearance at exposed side(s), rear, and top of the icemaker
for proper air circulation and ease of maintenance and service?
4) Have the shipping carton, tape, and packing material been removed from the
icemaker? Are the cube guides in their correct positions? Are the separators between
the evaporator banks properly attached to their holding clips?
5) Are all components, fasteners, and thumbscrews securely in place?
6) Have all electrical and water connections been made? Do electrical and water
connections meet all national, state, and local code and regulation requirements?
7) Has the power supply voltage been checked or tested against the nameplate rating?
Has a proper ground been installed to the icemaker? On three phase model, has
the transformer's voltage tap switch been positioned to match incoming voltage?
On remote air-cooled model, has a proper ground also been installed to the remote
condenser unit?
8) Are the water supply line shut-off valve(s) and drain valve(s) installed? Has the water
supply pressure been checked to ensure a minimum of 10 PSIG and a maximum of
113 PSIG?
Note: The icemaker may stop running when the water supply is off, or if the pressure
is below 10 PSIG. When the proper water pressure is reached, the icemaker
automatically starts running again.
9) Are the compressor hold-down bolts snug? Have the refrigerant lines been checked
to make sure they do not rub or touch other lines or surfaces? Have the fan blades (if
applicable) been checked to make sure they turn freely?
10) On remote air-cooled model, is the refrigerant line set tightened and free of leaks and
kinks?
11) On remote air-cooled model, has the icemaker power supply been on for a minimum of
4 hours?
12) Has the end user been given the instruction manual, and instructed on how to operate
the icemaker and the importance of the recommended periodic maintenance?
13) Has the end user been given the name and telephone number of an authorized service
agent?
14) Has the warranty card been filled out and forwarded to the factory for warranty
registration?