beautypg.com

Loading, 59 transporting – HONDA SNOWBLOWER HS724 User Manual

Page 61

background image

59

TRANSPORTING

LOADING

DOWN

FORWARD

UP

4.9 ft (1.5 m)
minimum headroom

L

H

Tie the snowblower down with rope or straps, and block the treads.
Keep the tie-down rope or straps away from controls and cables.

After the snowblower is in the truck, stop the engine, and turn the
fuel valve to the OFF position. This will prevent the possibility of
carburetor flooding and will reduce the possibility of fuel leakage.

Step on the foot pedal, and raise the auger to the HIGH
position (page

).

Start the engine (page

) and maneuver the snowblower into line

with the loading ramp.

Run the snowblower slowly up the loading ramp.

Push down the handles to raise the auger and run the
snowblower up the loading ramp.

Be careful to avoid striking the chute or other parts of the machine.

3.

4.

5.

1.

2.

Track type:

Track type:

Wheel type:

21

14

07/05/29 16:45:42 31767721_060

This manual is related to the following products: