beautypg.com

10 step, 10 step check list check list, Connect to a drainage system – Hotpoint WD71 User Manual

Page 7: Adjust the feet, This must only be done when the machine is upright

background image

4. Connect to a Drainage

System...

● Do not remove hooked end support from drainage hose.

● Do not position standpipe near an electrical outlet.

● For drainage into a standard work top sink ensure outlet pipe has a

minimum bore of 32 mm. To avoid syphoning ensure the end of the

drainage hose is above the water level in the sink. If your sink is inset, the

front edge of the basin must be less than 75 mm from the front edge of

your work top.

We recommend one of the following

drainage methods:-

Standpipe

Note: Ensure the standpipe has a

minimum diameter of 38 mm.

1. Ensure top of standpipe is positioned

at least 500 mm from the floor (Fig 1).

2. Untie the end of the GREY drainage

hose from the rear of the appliance

and place approximately 100 mm into

the standpipe.

3. If the end of GREY drainage hose is

fitted with ‘Retaining Flaps’, ensure

that they are fully inserted into the

standpipe as shown (Fig 2).

Sink Waste System

Note: Ensure the sink outlet pipe has a
minimum diameter of 32 mm.

1. Untie the end of the GREY drainage

from the rear of the appliance.

2. Reposition ‘Hooked End Support’ as

required along GREY drainage hose.

3. If fitting an under sink waste disposal

unit (Fig 3), cut out the membrane,

bung or blanking plug (Fig 4 and 4a).

4. Attach the GREY drainage hose to

the under sink waste disposal unit

securely, using a Jubilee clip.

5. Raise the hose to a minimum height

of 800 mm to avoid syphoning.

5. Adjust the Feet...

This must

only be done when the machine is upright

● Release locking rings on the two front feet.

● Screw feet in or out until appliance is

standing firm and level.

● Ensure all feet are in firm contact with the

floor and the machine is not leaning forward.

● Tighten the locking rings on the front feet to the underside of the cabinet.

Note: Your appliance may become noisy or move about the floor if it has
not been stabilised.

When you have installed your
appliance, ensure it is ready to use by
following this 10 Step Check List

1. Dispose of packaging safely,

see ‘Recycling Information’

on page 3.

2. Position appliance close to

electrical/water supply see

‘Location’ on page 4.

3. Remove transit brackets, screws

and spacers see ‘Remove

Transit Brackets’ on page 5.

4. Connect supplied hoses to

appliance water supply, confirm

water is flowing before connecting

to the appliance inlet valves

see ‘Water Supply’ on page 6.

5. Untie drainage hose at rear of

appliance and connect to either

a standpipe or sink waste drainage

system see ‘Drainage’ opposite.

6. Untie mains lead at rear of

appliance and plug into

electrical supply via a switched

socket, see ‘Electrical Supply’ on

page 2.

7. Position appliance, taking care

not to kink or damage hoses

at rear of appliance.

8. Stabilise the appliance, see

‘Adjusting the feet’ opposite.

9. Turn on the water supply

to the appliance.

10. Switch on at plug socket.

500 mm

Fig 1

Fig 3

Fig 2

Fig 4 - Before

Fig 4a - After

Your appliance is now ready to use,
refer to ‘Getting to Know your
Appliance’ on page 8 to familiarise
yourself with the appliance.

10 Step

10 Step

Check List

Check List

7