beautypg.com

0 chilled water models, 1 piping considerations, Hilled – Emerson 3000 User Manual

Page 60: Ater, Odels, Piping considerations

background image

Chilled Water Models

54

6.0

C

HILLED

W

ATER

M

ODELS

6.1

Piping Considerations

Manual shut-off valves should be installed at the supply and return lines to each unit. This will pro-

vide for routine service and emergency isolation of the unit.
Consideration of the minimum water temperature to be supplied from the chiller will determine if the

need exists to insulate supply and return lines. Insulation will prevent condensation on the supply

and return lines.
To provide for the emergency of water leaks and the consequences of sub-floor flooding, floor drains

should be provided with wet traps or a water detection system, such as a Liebert Liqui-tect, that is

installed near the base of the unit or below the elevated floor.

Figure 29 Chilled water general arrangement - Upflow (BU)

A

B

AB

FACTORY PIPING

SL-11899
Pg. 5

Air

Flow

Air

Flow

Chilled
Water
Coil

Chilled

Water

Coil

Bleed

Valve

Bleed

Valve

Valve

Actuator

Valve

Actuator

Valve

2-Way

Chilled

Water

Valve

Flow

Switch

(optional)

Chilled

Water

Supply

Chilled

Water

Supply

Chilled

Water

Return

Chilled

Water

Return

Hose
Bibs *

Hose
Bibs *

Shutoff

Valves *

Shutoff
Valves *

3-WAY VALVE

2-WAY VALVE

*Components are not supplied by Liebert but
are recommended for proper circuit operation
and maintenance.

FIELD PIPING

3-Way

Chilled

Water