beautypg.com

Power on, Power failure, Power on power failure – Enterasys Networks VH-8G-L3 User Manual

Page 32

background image

9033705-01

22

Figure 2-2B. Installing the Switch on an equipment rack

Power on

The VH-8G-L3 can be used with AC power supply 100-240
VAC, 50 - 60 Hz. Simply connect the power cord to the AC
power connector located on the rear panel of the Switch and
to AC power outlet. The Switch’s power supply will then
adjust to the local power source automatically and may be
started without having any or all LAN segment cables
connected.

After the AC power is connected, the LED indicators should
respond as follows:

• The Power LED indicator will remain steady while the

Switch loads onboard software and performs a self-
test.

• When linked with the redundant power supply, the

“RDP in use” LED will blink orange.

Power Failure

As a precaution in the event of a power failure, unplug the
Switch. When power is resumed, plug the Switch back in.