Power on, Power failure, Power on power failure – Enterasys Networks VH-8G-L3 User Manual
Page 32
9033705-01
22
Figure 2-2B. Installing the Switch on an equipment rack
Power on
The VH-8G-L3 can be used with AC power supply 100-240
VAC, 50 - 60 Hz. Simply connect the power cord to the AC
power connector located on the rear panel of the Switch and
to AC power outlet. The Switch’s power supply will then
adjust to the local power source automatically and may be
started without having any or all LAN segment cables
connected.
After the AC power is connected, the LED indicators should
respond as follows:
• The Power LED indicator will remain steady while the
Switch loads onboard software and performs a self-
test.
• When linked with the redundant power supply, the
“RDP in use” LED will blink orange.
Power Failure
As a precaution in the event of a power failure, unplug the
Switch. When power is resumed, plug the Switch back in.