beautypg.com

Installation, Inspecting your shipment, Inspecting your shipment installation – Enterasys Networks VH-8G-L3 User Manual

Page 30

background image

9033705-01

20

2. Installation

Inspecting Your Shipment

Open the shipping carton of the Switch and carefully unpack
its contents. The carton should contain the following items:

• One VH-8G-L3 8-port Gigabit Ethernet Layer 3

Switch.

• Mounting kit: 2 mounting brackets and screws.

• Four rubber feet with adhesive backing.

• One AC power cord.

• One ESD wrist strap.

• Product Documentation.

If any item is found missing or damaged, please contact your
local Enterasys sales agent for replacement.

Installation

Use the following guidelines when choosing a place to install
the Switch:

• The surface must support at least 3 kg.

• The power outlet should be within 1.82 meters (6

feet) of the device.

• Visually inspect the power cord and see that it is

secured to the AC power connector.

• Make sure that there is proper heat dissipation from

and adequate ventilation around the Switch. Do not
place heavy objects on the Switch.