Installation, Inspecting your shipment, Inspecting your shipment installation – Enterasys Networks VH-8G-L3 User Manual
Page 30
9033705-01
20
2. Installation
Inspecting Your Shipment
Open the shipping carton of the Switch and carefully unpack
its contents. The carton should contain the following items:
• One VH-8G-L3 8-port Gigabit Ethernet Layer 3
Switch.
• Mounting kit: 2 mounting brackets and screws.
• Four rubber feet with adhesive backing.
• One AC power cord.
• One ESD wrist strap.
• Product Documentation.
If any item is found missing or damaged, please contact your
local Enterasys sales agent for replacement.
Installation
Use the following guidelines when choosing a place to install
the Switch:
• The surface must support at least 3 kg.
• The power outlet should be within 1.82 meters (6
feet) of the device.
• Visually inspect the power cord and see that it is
secured to the AC power connector.
• Make sure that there is proper heat dissipation from
and adequate ventilation around the Switch. Do not
place heavy objects on the Switch.