Initial installation – Enviro C-11089 User Manual
Page 21
�� �����
�� �����
Install sealed throat connector or flashing to prevent leakage of
room air up through chimney.
DV Only: Before installing vent liners, mark each liner on both
ends to designate which is the intake and the exhaust.
Measure the height of the chimney beforehand and purchase the
appropriate kit. Never attempt to over-stretch a flexible liner to
accommodate the height of the chimney.
The flue damper can be fully blocked open or removed for
installation of the Sonnet; the smoke shelves, shields and baffles
may be removed if attached by mechanical fasteners.
The chimney must be clean, in good working order and
constructed of non-combustible materials.
Make sure that all chimney cleanouts are tight fitting and will not
permit air to leak into the chimney.
DV Only: The air intake can be increased to a standard 3” size
using Adaptor (50-1499 - 2” to 3” Air Intake) included with this unit.
Refractory, glass doors, screen rails, screen mesh and log grates
can be removed from the fireplace before installing the Sonnet.
Initial Installation
QUALIFIED INSTALLERS ONLY
Figure 38: Installation of Sonnet DV and BV.
D
IRECT
V
ENT
V
ERTICAL
V
ENT
T
ERMINATION
:
For use with Sonnet Direct Vent Fireplace Insert. The Vertical Vent Cap is termination, rain cap,
and a throat connector, it will ensure a tight seal, top performance, safety and efficiency.
KIT COMPONENTS:
Quantity Description
Quantity Description
1
Vertical Direct Vent Termination Cap
1
4 oz Tube RTV Silicone
6
9
/
16
” Tex Screws
1
4 oz Tube Mill-Pac Sealant
Please ensure that all components are supplied with this kit. If components are missing or have
been damaged, contact your dealer, distributor, or courier company. Do not attempt the installation if
components are missing or damaged.
INSTALLATION INSTRUCTIONS:
1. Plan your installation and clearances to combustibles. The Sonnet may be installed and vented into
any solid fuel fireplace that has been installed in accordance with the National, Provincial/State and
local building codes and has been constructed of non-combustible materials. Also refer to the I
NITIAL
I
NSTALLATION
- P
REPARING
Y
OUR
S
ONNET
F
OR
I
NSTALLATION
and C
LEARANCES
TO
C
OMBUSTIBLES
sections.
Refer to Figure 41 throughout installation.
2. Stretch both the Ø3” (76mm) flex vent and the Ø2” (51mm) flex intake liner to the length needed to
ensure the flex can be easily connected to the vent terminal.
21