beautypg.com

Initial installation – Enviro C-11212 User Manual

Page 20

background image

Initial Installation

QUALIFIED INSTALLERS ONLY

C

ONVERTING

A D

IRECT

V

ENT

F

IREPLACE

T

O

A B-V

ENT

F

IREPLACE

:

Direct Vent

Connector Assembly

Fresh Air

Inlet Covers

1. Remove the Direct Vent

chimney connector assembly

by taking out the two (2) T-20

screws at the front of the unit.

Push the assembly out from

under the brackets at the back

and remove (see Figure 24).

2. Remove the two (2) fresh air

inlet covers from each side.

Cover locations shown in

Figure 25.

3. Slide the B-Vent chimney

connector assembly into the

same position the Direct Vent

chimney connector assembly

was in. Ensure the tabs are

under the brackets at the back

and the holes at the front line

up. Secure into place with the

two (2) T-20 screws at the

front of the unit.

4. Disconnect the two (2) blue

wires at the opening to the

right of the unit and connect

them to the 300°F (149°C)

manual reset spill switch at

the rear of the B-Vent chimney

connector with the wires

supplied. Refer to Figure 26.

5. Test fire the appliance and

ensure proper operation. A

venturi adjustment could be

required to achieve an efficient

flame. Improper operation

or adjustment could result in

Carbon Monoxide production

causing personal injury or

property damage.

Figure 25: Converting to a BV fireplace.

B-Vent

Connector Assembly

300°F (149°C)

manual reset

spill switch

Figure 26: Converting to a BV fireplace.

20

This manual is related to the following products: