Initial installation – Enviro C-11212 User Manual
Page 20
Initial Installation
QUALIFIED INSTALLERS ONLY
C
ONVERTING
A D
IRECT
V
ENT
F
IREPLACE
T
O
A B-V
ENT
F
IREPLACE
:
Direct Vent
Connector Assembly
Fresh Air
Inlet Covers
1. Remove the Direct Vent
chimney connector assembly
by taking out the two (2) T-20
screws at the front of the unit.
Push the assembly out from
under the brackets at the back
and remove (see Figure 24).
2. Remove the two (2) fresh air
inlet covers from each side.
Cover locations shown in
Figure 25.
3. Slide the B-Vent chimney
connector assembly into the
same position the Direct Vent
chimney connector assembly
was in. Ensure the tabs are
under the brackets at the back
and the holes at the front line
up. Secure into place with the
two (2) T-20 screws at the
front of the unit.
4. Disconnect the two (2) blue
wires at the opening to the
right of the unit and connect
them to the 300°F (149°C)
manual reset spill switch at
the rear of the B-Vent chimney
connector with the wires
supplied. Refer to Figure 26.
5. Test fire the appliance and
ensure proper operation. A
venturi adjustment could be
required to achieve an efficient
flame. Improper operation
or adjustment could result in
Carbon Monoxide production
causing personal injury or
property damage.
Figure 25: Converting to a BV fireplace.
B-Vent
Connector Assembly
300°F (149°C)
manual reset
spill switch
Figure 26: Converting to a BV fireplace.
20