Fuel conversion, Maintenance and service – Enviro C-11212 User Manual
Page 11
Maintenance And Service
F
UEL
C
ONVERSION
:
TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY
Please read and understand these instructions before installing.
Figure 11: Removing
valve cap.
a) Remove the main burner orifice with a 1⁄2 inch deep socket.
b) Put a bead of pipe-thread sealant or approved Teflon tape on the orifice
threads before installing into the brass elbow.
c) Install the new orifice(s) from the kit into the brass elbow.
6. Convert the pilot injector:
a) Pull the pilot hood straight up to access the pilot injector.
b) Using a
5
/
32
” or 4 mm Allen key, remove the pilot injector.
c) Install the new pilot injector supplied with this conversion kit. Simply screw
the new injector inside the pilot hood using the Allen key,
d) Reinstall the hood by placing the hood on the assembly, line up the key
way, and snap into place.
7. Convert the SIT gas valve:
a) Remove the black protection cap from the HI/LO knob by hand shown in
Figure 11.
11
Warning: This conversion kit shall be installed by a qualified service agency in accordance
with the manufacturer’s instructions and all applicable codes and requirements of the
authority having jurisdiction. If the information in these instructions is not followed
exactly, a fire, explosion or production of carbon monoxide may result causing property
damage, personal injury or loss of life. The qualified service agency is responsible for
the proper installation of this kit. The installation is not proper or complete until the
operation of the converted appliance is checked as specified in the manufacturer’s
instructions supplied with the kit.
Kit Parts List for Sienna:
1 - Orifice (NG #32 DMS or LP #49 DMS)
1 - Pilot Injector (NG 0.62 mm; LP 0.35 mm)
1 - Installation instruction sheet
1 - Conversion label
Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are
missing, contact your dealer, distributor or courier company to have them replaced before starting this
installation.
Conversion Kit Installation:
1. Turn control knob on the gas valve to the “OFF” position and shut the gas supply off at the shut-off
valve upstream of the unit. CAUTION: The gas supply must be shut off prior to disconnecting the
electrical power and before proceeding with the conversion. Allow the valve and unit to cool down
to room temperature.
2. Remove the glass as shown in the M
AINTENANCE
AND
S
ERVICE
- G
LASS
D
OOR
R
EMOVAL
.
3. Carefully remove the log set and ember material if they are installed.
4. Remove the burner as shown in the M
AINTENANCE
AND
S
ERVICE
- B
URNER
AND
B
LOWER
R
EMOVAL
.
5. Convert the burner orifice(s):