beautypg.com

Installation, Remove this area – Whelen 402000AR User Manual

Page 2

background image

Page 2

TIE RING TERMINALS TO

CHASSIS GROUND

(STROBE LIGHT UNITS ONLY)

Pilot Hole

for #6 SMS

(Qty 4)

1.187"

2.375"

1.375"

2.75"

1.58"

.790"

4.200"

2.100"

4.60"

2.300"

1.685"

3.37"

1.75" MINIMUM

MOUNTING

DEPTH

1.46"

2.61"

400-SERIES LINEAR STROBE LIGHTHEAD

A/R

10

1

9

1

8

7

A/R

6

A/R

5

A/R

4

A/R

3

A/R

2

4

1

A/R

DESCRIPTION

PART NUMBER

ITEM

QTY

CABLE ASSEMBLY with KIT

GASKET

REFLECTOR

LINEAR

ASSEMBLY /

LENS RED

/

LENS GREEN

/

LENS CLEAR

/

LENS BLUE

/

LENS AMBER

/

#6 x 1 1/2" PHILLIPS PAN HEAD SMS

LENS KKKE-SPEC RED

/

MODEL 400 SERIES

LINEAR STROBE

ASSEMBLY /

ASSEMBLY / SPLIT LENS

0 1 - 0 4 4 0 6 2 4 - 1 5

3 8 - 0 2 6 2 8 6 7 - 0 0

0 2 - 0 3 6 2 8 2 4 - 0 0

6 8 - 3 1 8 3 7 2 5 - 5 S

6 8 - 3 1 8 3 7 2 5 - 4 S

6 8 - 3 1 8 3 7 2 5 - 3 S

6 8 - 3 1 8 3 7 2 5 - 2 S

6 8 - 3 1 8 3 7 2 5 - 1 S

0 1 - 0 6 6 3 4 7 8 - ( )

6 8 - 3 1 8 3 7 2 5 E 5 S
0 2 - 0 3 6 3 4 8 4 * * S

A/R

11

10

11

9

1

2 3 4 5

6 7 8

SPECIFICATIONS

VOLTAGE ANODE = 225 VDC (MIN.)
VOLTAGE TRIGGER = 150 VDC (MIN.)

CABLE:
0 =
without CABLE
1 = with CABLE

COLOR:
R =
B =
G =
A =

RED
BLUE

GREEN

AMBER

0 1 - 0 6 6 3 4 7 8 - _ _

CABLE REQ.

COLOR

BASIC P/N

CLEAR
SPLIT

"E" SPEC

RED

C =

=

5 =

C

5 =

REMOVE THIS AREA

REMOVE THIS AREA

MOUNTING DIMENSIONS

REMOVE THIS AREA

1.

Position the lighthead in its approximate mounting location.
Make sure that the lighthead will not interfere with any
existing equipment. Also, be aware of any and all items on the
opposite side of the mounting surface to prevent any possible
damage to existing components.

2.

Remove the lighthead. Measure and mark off onto the
mounting surface, the mounting holes and cut-out as shown.

3.

Using an appropriately sized drill bit, drill the pilot holes.

4.

Cut out and remove the area indicated in the mounting
diagram.

5.

Route the cable assembly towards the strobe power supply.
Be sure that both ring terminals are grounded to the vehicle
chassis ground.

6.

Plug the lighthead into the cable and plug
the cable into the strobe power supply.
Test operation of the lighthead before
securing it to the vehicle.

7.

Secure the assembly onto the mounting
surface with the supplied sheet metal

screws.

Installation:

WARNING! The strobe light power supply is a high
voltage device. Do not touch or remove the strobe tube
assembly while in operation. Wait 10 minutes after
disconnecting the power source before starting any
work on the power supply or system.

WARNING! All customer supplied wires that connect to
the positive terminal of the battery must be sized to
supply at least 125% of the maximum operating current
and FUSED at the battery to carry that load. DO NOT
USE CIRCUIT BREAKERS WITH THIS PRODUCT!