beautypg.com

9 - precautions before start-up – MCZ Toba HYDRO 22 User Manual

Page 3

background image

3

ON

OFF

B

MENU

9 - PRECAUTIONS BEFORE START-UP

Technical Dept. - All rights reserved - Reproduction is prohibited

GENERAL PRECAUTIONS

Remove any objects that may burn from the brazier (manual, various adhesive labels or any remaining polystyrene).

Check that the brazier is positioned correctly and rests properly on the base.

The first start-up may not be successful as the feed screw is empty and does not always manage to load the required

amount of pellets in time to light the flame.

CANCEL THE ALARM FOR THE LIGHTING FAILURE BY HOLDING DOWN BUTTON 1 (ESC). REMOVE THE PELLET LEFT IN THE

BRAZIER AND REPEAT THE START-UP.

If after repeated attempts, the flame fails to ignite, despite a regular flow of pellets in the brazier, check that the brazier is seated correctly:

it must rest snugly against the slots and be clean of any ash incrustations. If no anomaly is found during this inspection, there

may be a problem with the product components or installation may not be correct.

REMOVE THE PELLETS FROM THE BRAZIER AND CONTACT AN AUTHORISED TECHNICIAN.

Do not touch the boiler during the first lighting, as it is during this phase that the paint sets.

If necessary, touch up the paint with the aerosol spray in the original colour (see ''Accessories for pellet stoves'').

It is good practice to ensure effective ventilation in the room during the initial start-up, as the boiler will emit some

smoke and smell of paint.

ATTENTION!

Please ensure the brazier is clear of ALL pellets and ash build up following any failed ignitions. Failure to clear out

the brazier prior to resetting may result in further failed ignitions or in certain conditions an explosive ignition.

Do not stand close to the stove and, as mentioned, air the room. The smoke and smell of paint will disappear after about an hour of

operation, however, they are not harmful in any case.

The boiler will be subject to expansion and contraction during the lighting and cooling down stages, and may therefore make slight

creaking noises.

This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.

It is extremely important to make sure the boiler does not reach high temperatures straight away, but to increase the temperature

gradually using low power at first.

This will prevent damaging the ceramic or serpentine stone tiles, the welds and the steel structure.

DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!

ATTENTION!

If during operation or initial ignition you encounter smoke spillage in to the room from the appliance

or the flue then please switch off the appliance, ventilate the room and contact the installation / service

engineer immediately.

SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP

After connecting the power cable to the electrical socket, turn the power switch to the (I) position. To turn the stove on or off, press the

button “B” on the control panel.

This manual is related to the following products: