beautypg.com

Installation of fan 480m, Installation of temperature probe – MCZ FC700-715 - 180+180 m3/h User Manual

Page 12

background image

Chapter 2

INSTALLATION AND USE MANUAL

page

12

Installation and assembly

Technical service – MCZ S.p.A. all rights reserved - Reproduction prohibited

2.6.1. Installation of fan 480m

3

/h

For the installation of the forced ventilation kit of 480 m

3

/h, proceed as

follows:

1. EXTRACT THE HERMETIC BOTTOM:
• Raise the door of the fire box
• Remove the refractory panels (Alutec®)
• Loosen the self-tapping screws A and remove the tray B that

contains the alutec panels

(figure 10)

• Extract the hermetic bottom C by loosening the two nuts D

(figure 10)

2. INSTALL THE FAN ON THE HERMETIC BOTTOM
• On the hermetic bottom, locate the fastening holes located

around the flange of the fan

• Screw in the electric fan of 480m

3

/h using the previously

identified holes on the hermetic bottom using the screws E

(figure 11)

• Before putting the hermetic bottom B back in place, make the

electrical connections as shown in the previous paragraph.

• Use special care when installing the temperature probe.

3. INSTALLATION OF TEMPERATURE PROBE
• Follow the instructions in the next paragraph

2.6.2. Installation of temperature probe

It is advisable to provide in advance for the connections of control

unit FC715 as shown in

diagram 1 on page 22.


PROBE INSTALLATION:

Identify the pass-through hole for the insertion of the probe D,

located on the right or left side of the fireplace stove

(figure 12)

Insert in the hole D the screw that supports the probe E and lock

it with the nut H

Screw in without tightening completely the screw that holds

the probe G to the probe support E, placing in between the bush

F

(figure 12).

Insert probe S all the way into the hole of the screw that holds

probe G and gently tighten the screw G (size 7 wrench).

Once the connection is complete and the plug placed in the socket of

the home, check that the red LED on the control unit lights up.

All wiring must be carried out with the electrical

socket disconnected.
Make sure that the electrical sockets are grounded.



Figure 11 – Installation of fan 480 m

3

/h

Figure 10 – Disassembly of internal hermetic

bottom

Figure 12 – Probe installation

A

Tray

B

Alutec

panels

Bottom

C

D

FORMA

section

Bottom

C

E

Fan

H

E

F

G

D

S