Fig.3, Fig.2 – Sealey TPSJK User Manual
Page 2

NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
iMPortant: no liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
inForMation: for a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
01284 757500
01284 703534
sole UK Distributor, sealey group,
Kempson Way, suffolk Business Park
,
Bury st. Edmunds, suffolk,
IP32 7Ar
www.sealey.co.uk
Web
4.9 back to back Configuration - this manual has described
how to build this storage system side by side but its possible to
build with each unit back to back.
4.9.1 to do this build the storage system as described but instead of
putting the double uprights on the right short side of the frame
configure to the long back side of the frame.
4.9.2 then build up as fig.3 and install the rest of the shelf beams.
4.9.3 finally place wire shelves onto frame starting with the shelf for
the larger bins at the bottom and working up.
follow from section
4.2. from tPs22, tPs36 instructions.
fig.3
Original Language Version
tPsJK Issue: 1 - 09/02/11
4.6 using the double uprights as a start point, build up the other
half to the storage system, use fig.4 or fig.5 for reference and
follow from section
4.2. from tPs22, tPs36 instructions.
fig.2