Initial installation – Enviro Cara User Manual
Page 25
25
c
athedral
c
eiling
i
nstallation
:
Figure 39: Use of Wall Straps.
Figure 40: Multi-Story Vent Pipe Installation.
Initial Installation
QUALIFIED INSTALLERS ONLY
Figure 41: Cathedral Ceiling Support Box Leveling.
1. Follow installation steps 1 & 2 under I
nItIal
I
nstallatIon
- V
ertICal
I
nstallatIon
.
2. Using the plumb bob, mark the centerline of
the venting system on the ceiling and drill a
small hole through the ceiling and roof at this
point. From the roof, locate the drill hole and
mark the outline of the “Cathedral Ceiling
Support Box”.
3. Remove shingles or other roof coverings as
necessary to cut the rectangular hole for the
“Support Box”. Cut the hole ⅛” larger than
the “Support Box” outline.
4. Lower the “Support Box” through the hole in
the roof until the bottom of the “Support Box”
protrudes at least 2 inches (5 cm) below the
ceiling. Align the “Support Box” both vertically
and horizontally with a level as shown in
Figure 41 Temporarily tack the “Support Box”
in the place through the inside walls and into
the roof sheathing.