beautypg.com

2 wall mounting, 3 top hat rail installation, Wall mounting – SMA BEAM REPEATER User Manual

Page 17: Top hat rail installation

background image

SMA Solar Technology AG

Installation

User Manual

SBeamRep-BEN091911

17

5.2 Wall Mounting

Mounting accessories provided

1. Pull the USB power supply plug out of the socket.
2. Pull the USB plug out of the Sunny Beam Repeater.
3. Use the provided drilling template to determine the position of the Sunny Beam Repeater on the

wall. Observe the USB power supply's cable length.

4. Mark the position of the drill holes.
5. Drill the holes and install the screws. Use screws with a shank diameter of 3.5 mm to 4.5 mm

(e. g. 4.5 mm x 60 mm).

6. Leave about 6 mm clearance between the screw head and the wall.
7. Hang the Sunny Beam Repeater on the screws (see figure).

8. Plug the USB power supply's USB plug into the socket on the lower

edge of the housing of the Sunny Beam Repeater.

9. Then plug the USB power supply's plug into the socket.

All LEDs on the Sunny Beam Repeater briefly shine green. The
Sunny Beam Repeater starts up. This procedure takes
approximately 1 minute.

5.3 Top Hat Rail Installation

1. Pull the USB power supply plug out of the socket.

Position

Quantity

Description

A

1

drilling template