beautypg.com

Corner installations, Initial installation – Enviro ENVIRO User Manual

Page 25

background image

25

Figure 39: Cathedral Ceiling Support Box

Installation.

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 40: Corner installation rear vented with

snorkel.

Figure 41: Corner installation top vented.

C

ORNER

I

NSTALLATIONS

:

Do not interfere with the structural integrity of the walls.
For installations with a 36” (915 mm) snorkel refer to Figure 40 and I

NITIAL

I

NSTALLATION

- V

ENT

C

ONFIGURATIONS

AND

R

ESTRICTOR

S

ETTINGS

. For other corner installations refer to Figure 41 and I

NITIAL

I

NSTALLATION

- V

ENT

C

ONFIGURATIONS

AND

R

ESTRICTOR

S

ETTINGS

.

Also refer to I

NITIAL

I

NSTALLATION

- C

LEARANCES

TO

C

OMBUSTIBLES

.

5. Using tin snips, cut the “Support Box” from the top corners

down to the roof line, and fold the resulting flaps over the

roof sheathing (Figure 39). Before nailing it in to the roof,

run a bead of non-hardening mastic around the top edges

of the “Support Box”, to make a seal between the box and

the roof. Clean out any combustible material from the

inside of the “Support Box”.

6. Complete the cathedral ceiling installation by following the

same procedures outlined in Steps 4 through 9 for I

NITIAL

I

NSTALLATION

- V

ERTICAL

I

NSTALLATION

.