beautypg.com

Diagram d – ShoreLand'r TA0015 V.2 User Manual

Page 3

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003263

REV D 04/29/2008

Page 3

Battery Box Installation Instructions

Locate the battery box mounting plate, Item No. 1 and the battery

boxes. Note that there are two battery boxes and two batteries.

They are both required to power the brake system in the event of

an unwanted disconnect from the tow vehicle.

1. Attach the two battery boxes to the mounting plate using ¼” x 1”

carriage bolts and ¼” lock nuts as shown in Diagram D. Once

all bolts are installed, tighten.

2. Place the assembly on the inside of the frame as shown in Dia-

gram A and secure to the frame using two of the appropriate

size U-bolts as described earlier in the actuator assembly in-

structions. Secure with 3/8” hex nuts w/ nylon locks. Position

the battery box assembly from the front of the frame to the front

of the mounting bracket as shown in Diagram C. Leave the u-

bolts loose so the battery boxes can be moved forward so the

battery wire harness will reach.

Batteries

1. Place the batteries in the battery boxes. Remove the protective

covers from the battery terminals. Locate the battery wire har-

Diagram D

SD Control

Module

Brakeline

Port