beautypg.com

Grass Valley MPEG Upgrade User Manual

Page 25

background image

Installing Boards in an Option MG Unit

MPEG Board Upgrade Installation

15

7. Connect the audio clock and Sharcnet cables according to the diagram you

drew earlier or see “Audio Clock and Sharcnet Cabling” on page 21.

8. If you plan to install additional video I/O or audio boards, do so now using

the instructions provided with each field installation kit.

9. Follow the reassembly instructions under the heading “Reassembling the

Profile Chassis” on page 28.

WARNING: To avoid personal injury from electrical shock and/or damage to
disk drives, do not apply power until all covers are in place and secured.

Figure 6. Installing the five-slotted PCI Interconnect board

!!

0169-1

Slave EDR Board

MPEG Board

Master EDR Board

Fibre Channel Board

MPEG Board

Alignment Keys

PCI Interconnect

Board