beautypg.com

Grass Valley iTX Master Control v.2.6 User Manual

Page 33

background image

29

Master Control (ITX-MC)

User Guide

Similarly, you can edit the event’s duration value by clicking on the Duration setting in the
Schedule grid. The Change duration tool appears and you can change the event’s current
value.

When a master control secondary event is selected in the Schedule Grid or Timeline, the
Event Editor displays a set of standard and event type specific properties (see

Figure 3-3

on

page 29). These properties can be edited and applied to the scheduled event by clicking
the Store Changes button.

Fig. 3-3: Event Editor for a master control secondary event.