beautypg.com

Server installation and initial setup, Connecting the ios, Connecting the vga-monitor (optional) – Grass Valley K2 Edge Installation v.4.1.0 User Manual

Page 22: Connecting blackburst, gpio and ltc (optional), Connecting the power cables and power on, 11 server installation and initial setup

background image

K2 Edge Installation and Service Manual - document version: 4.1

– Page 22

11

Server installation and initial setup

The steps for installation and network configuration of the K2 Edge nodes are:

1) Place the servers in the rack and connect cables and IOs.

2) Configure the IP Manager.

3) Configure the K2 Edge network settings via the IP Manager web interface.

4) Select a preset for Channel configuration.

5) If applicable, configure time settings.

6) If applicable, configure licenses.

11.1 Connecting the server to the LAN and connecting the IP Manager

Following cables must be connected:

Network cable LAN

Connect to eth0

Network cable for the IP Manager

Connect to IPM



11.2 Connecting the IOs

IO1-IO8

Note that presets are defined for port configuration [see chapter
12]. Bypass can be enabled on IO1 (in) and IO2 (out).

11.3 Connecting the VGA-monitor (optional)

VGA-monitor (console)

Connect to VGA

Keyboard (console)

Connect to KBD



11.4 Connecting blackburst, GPIO and LTC (optional)

Blackburst

Connect to GL

GPIo

Connect to GPIo [see the appendix for pinning]

LTC

Connect to LTC [see the appendix for pinning]


11.5 Connecting the power cables and power on

Power cables (redundant)

Connect the ACs

K2 Edge automatically powers on when connected to a power source. To power on manually, press
the rotary knob. When powered on, the LCD panel illuminates.