beautypg.com

Iii connection and startup, Iii.1 ec housing design – Eneo VHM/ECLKA-W User Manual

Page 14

background image

4

PE
L1
N
PE
N

L1
ST

AT

MAINS

PE

11

10

1

2

3

4

5

6

7

8

9

Fig. 3

Wiring EC housing

Assembling of screw terminal board

Fig. 4

III Connection and startup

III.1 EC housing design

The EC housing models do not have a central plug con-
nection, i.e. the supply and signal cables are fed through
the housing body. (see fig. 3). Consequently, connections
on the camera can be removed easily without need for

disassembling cables; these can be left at the installa-
tion point with the housing rear section and integrated
cables in the event of temporary removal, or used for
connection of another unit in the event of replacement.

We recommend the use of a KV and KVS screw terminal
board for mains distribution and heating connection
(see section VI, Accessories).

This manual is related to the following products: