beautypg.com

6 commissioning, 1 preparations, 2 commissioning – Watson-Marlow Bredel 265 User Manual

Page 31

background image

COMMISSIONING

31

6

COMMISSIONING

6.1

Preparations

1.

Check that the correct number of shims
corresponds with your application. Refer to
§

11.1.7

.

For adjusting the compression force of the
hose, refer to §

8.8

.

2.

Check that the lubricant level is above the
minimum level line in the inspection window. If
necessary add Bredel Genuine Hose Lubricant
via the breather/vent plug. See also §

8.4

.

3.

Connect the electric motor in conformance with
the locally applicable rules and regulations.
Refer to the manual of the electric motor.
Ensure that the electrical installation work is
carried out by qualified personnel.

6.2

Commissioning

1.

Connect the pipework.

2.

Make sure that there are no obstructions such
as closed valves.

3.

Switch on the hose pump.

4.

Check the rotation direction of the pump rotor.

5.

Check the capacity of the hose pump. If the
capacity differs from your specification, follow
the instructions in chapter

10

or consult your

Bredel representative.

6.

Check the hose pump in accordance with points
1 to 4 of the maintenance table from §

8.2

.

This manual is related to the following products: