Installation guide, Hotlok – Upsite 10132 RAM Kit 90 Extrusion & Sealing Membrane User Manual
Page 3

3
888.982.7800
www.upsite.com
Installation Guide
HotLok
®
Rack Airflow Management Kit
Installation Procedures
The HotLok
®
Rack Airflow Management Kit fits most rack configura-
tions based upon your measurements taken during the preparation
directions. The design is to be easy for removal and reuse as needed
for your rack systems.
1. Clean rack surface to be free of dust, lint or dirt particles where
the Mounting Extrusions will be installed. This is especially critical
when using the adhesive material, as any dirt or debris will impact
the adhesive.
a. Use an alcohol wipe or a clean cotton cloth, damp with a
solution of at least 50% isopropyl alcohol.
i.
Helpful Hint: When choosing your cleaning cloth,
do not use fabric or paper that will disintegrate or
leave particles that could interfere with the adhe-
sive.
2. Install the Mounting Extrusion
a. External clip-on method:
i. Install each piece that is cut on the “lip” of the
rack using the proper clip.
Special Note: See Figures 1 and 2 for the
proper retention clip to use for the rack and
for the Sealing Membrane.
b. For adhesive (inside of the rack method):
i. Attach the adhesive to the Rack Lip Retention Clip
face (see Figures 1 and 2) but leave the adhesive
backing on until the product is ready to install.
ii. When ready to install, peel off the backing and
place inside of your rack system.
Helpful Hint: Press firmly along the full
length of the extrusion to secure in place
(figure 1)
(figure 2)
Surface for
Adhesive
Surface for
Adhesive
Sealing Membrane
Retention Clip
Sealing Membrane
Retention Clip
Rack “Lip”
Retention Clip
Rack “Lip”
Retention Clip