beautypg.com

Installation guide, Hotlok – Upsite 10132 RAM Kit 90 Extrusion & Sealing Membrane User Manual

Page 3

background image

3

888.982.7800

www.upsite.com

Installation Guide

HotLok

®

Rack Airflow Management Kit

Installation Procedures

The HotLok

®

Rack Airflow Management Kit fits most rack configura-

tions based upon your measurements taken during the preparation
directions. The design is to be easy for removal and reuse as needed
for your rack systems.

1. Clean rack surface to be free of dust, lint or dirt particles where
the Mounting Extrusions will be installed. This is especially critical
when using the adhesive material, as any dirt or debris will impact
the adhesive.

a. Use an alcohol wipe or a clean cotton cloth, damp with a

solution of at least 50% isopropyl alcohol.

i.

Helpful Hint: When choosing your cleaning cloth,

do not use fabric or paper that will disintegrate or

leave particles that could interfere with the adhe-

sive.
2. Install the Mounting Extrusion

a. External clip-on method:

i. Install each piece that is cut on the “lip” of the

rack using the proper clip.

Special Note: See Figures 1 and 2 for the

proper retention clip to use for the rack and

for the Sealing Membrane.

b. For adhesive (inside of the rack method):

i. Attach the adhesive to the Rack Lip Retention Clip

face (see Figures 1 and 2) but leave the adhesive

backing on until the product is ready to install.

ii. When ready to install, peel off the backing and

place inside of your rack system.

Helpful Hint: Press firmly along the full

length of the extrusion to secure in place

(figure 1)

(figure 2)

Surface for

Adhesive

Surface for

Adhesive

Sealing Membrane

Retention Clip

Sealing Membrane

Retention Clip

Rack “Lip”

Retention Clip

Rack “Lip”

Retention Clip

This manual is related to the following products: