beautypg.com

Accessories, Ref# part# description quantity – Smithco Spray Star 1100e 10-500-A Parts & Service Manual User Manual

Page 39

background image

37

Accessories

10-160 STAINLESS STEEL 15' MANUAL BOOM PARTS LIST (CONTINUED)

REF#

PART#

DESCRIPTION

QUANTITY

29

15-014

Shift Knob

2

30

HB-38-16-175

Bolt

3

/

8

- 16 x 1

3

/

4

2

HN-38-16

Nut

3

/

8

- 16

2

31

15-561

Boom Lift

2

32

HBS-12-13-550

Stainless Steel Bolt

1

/

2

- 13 x 5

1

/

2

2

HNCL-12-13

Center Lock Nut

1

/

2

- 13

2

33

15-811

Left Cam Stop

(must also order 15-812)

1

18-268

Oilite Bushing

2

34

18-289

Bushing

3

/

8

ID

-

1

/

2

OD x

5

/

8

4

35

HB-38-16-225

Bolt

3

/

8

- 16 x 2

1

/

4

2

HNTL-38-16

Lock Nut

3

/

8

- 16

2

36

10-247

Right Boom Stabilizer

1

15-020

Hand Grip

2

37

21-212

Extension Spring

1

38

HB-38-16-300

Bolt

3

/

8

- 16 x 3

1

HW-38

Washer

3

/

8

2

HNTL-38-16

Lock Nut

3

/

8

- 16

1

39

10-162

Boom Support

1

40

HB-516-18-225

Bolt

5

/

16

- 18 x 2

1

/

4

2

HNTL-516-18

Lock Nut

5

/

16

- 18

2

41

10-246

Left Boom Stabilizer

1

15-020

Hand Grip

2

42

18-411

Stainless Steel Pipe Elbow

3

/

4

x 45°

2

For best result use Teflon

®

tape on all fittings.

1.

The three boom assemblies are not on the packing list but are in the carton. The long boom assemblies are the right
and left booms. The labels are located on the pivot brackets (Ref 13 and 26). The small boom assembly is the center
boom. You can NOT order these boom assemblies as one unit. Please refer to parts drawing for individual parts.

2.

Mount small boom assembly to the boom carriers on sprayer using four boom brackets (Ref 8), four bolts,

3

/

8

- 16 x 5

1

/

2

and four lock nuts,

3

/

8

- 16 (Ref 7). One boom bracket

should go on boom assembly and one on boom

carrier. Do the same for right and left side. Place boom at desired level (approximately 20" (51 cm) nozzle height) and
center. Tighten bolts.

3.

Put the actuator brackets (Ref 20 and 22) on the center mount (Ref 21) using

3

/

8

- 16 x 1

1

/

4

bolts, washers and lock

nuts, with washers next to the slots. Snug up the bolts so that you can adjust actuator brackets with the set screws
(Ref A) on the center mount after booms have been mounted.

4.

Take right boom and slide pivot bracket (Ref 24) in center mount (Ref 21) and hold in place with

1

/

2

- 13 x 5

1

/

2

bolt

and

1

/

2

- 13 center lock nut

(Ref 32).

Do not over tighten, boom must be able to move up and down. Repeat for left

boom.

5.

Install boom lifts (Ref 31) using clevis pin and cotter pin (Ref 27) so the bushing end hooks to the pivot bracket
(Ref 24) and the slotted end hooks to the actuator bracket (Ref 20 and 22).

6.

Hook hoses to respective fittings using hose clamps (18-040). The hose coming from right side of sprayer goes to
straight fitting on right boom. Center hose from sprayer goes to straight fitting on center boom. The left hose from
sprayer goes to straight fitting on left boom. Be sure all clamps are tight.

7.

Use the adjustment slots on the boom lifts to completely lift and lower booms.

8.

Using set screws (Ref A) adjust actuator brackets so nozzles of booms are at same height with nozzles of center
section. Tighten bolts holding actuator brackets to center mount and locknuts on set screws.

9.

Rubber boom carrier and latch are located on the horizontal boom support on top of tank.

10.

Put the viton gaskets (16-800), Raindrop tips (16-805) and quick TeeJet caps (16-921) on nozzle bodies (16-
996) on the three boom sections.

11.

Make certain set screws (B) on both sides are completely screwed in and locked with the lock nut.