beautypg.com

Spiker lift parts list, Installation instructions, Accessories – Smithco Supreme 35-000 (sn 101978) Parts & Service Manual User Manual

Page 105

background image

103

Accessories

SPIKER LIFT PARTS LIST

REF#

PART#

DESCRIPTION

QUANTITY

1

13-357

Hydraulic Cylinder

1

HNJ-34-16

Jam Nut

3

/

4

- 16

1

2

13-366

Cylinder Extension

1

3

13-382

Cylinder Lift Frame

1

4

13-658

Right Pivot Bracket

1

5

13-659

Left Pivot Bracket

1

6

HB-12-13-150

Bolt

1

/

2

- 13 x 1

1

/

2

4

HW-12

Washer

1

/

2

4

HWL-12

Lockwasher

1

/

2

4

HN-12-13

Nut

1

/

2

- 13

4

INSTALLATION INSTRUCTIONS

1. To mount Spiker onto the Supreme you must remove the rake lift.

2. On all Supremes you have to unhook the speed boss arm before removing the rake lift. Completely

remove the linkage yoke, ball joint and linkage rod from machine. The speed boss does not need to
function when using the Spiker.

3. Set the spiker behind the machine. Bolt the Spiker to the main frame using the inside holes on the pivot

brackets (Ref 4 & 5). Use the

1

/

2

- 13 x 1

1

/

2

bolts, washers, lockwashers and nuts (Ref 6).

4. Thread the cylinder extension (Ref 2) all the way onto the cylinder (Ref 1). Tighten down with jam nut.

5. Using the second hole from the end of the cylinder extension, hook the cylinder extension (Ref 2) to the

bottom hole on the cylinder tab on the cylinder lift frame (Ref 3).

6. Compression springs should be tightened to 5

1

/

2

" for best result.

7. Test spiker for ground penetration. If there is too much ground penetration loosen the springs. If you

need more ground penetration, tighten springs.

The speed boss is not used with spiker. Leave unhooked.

This manual is related to the following products: