beautypg.com

Seaward B255 User Manual

Page 18

background image

Operating Manual

Clare B255 Power Tool & Appliance Test Station

14

Accessories

1. Mains Lead – fitted with a standard BS1363 square pin 13A plug top for

connection to an Earthed supply outlet. It is also recommended that the
outlet is fitted with an RCD protection device.

2. Test Output Socket Box – the standard box is fitted with sockets to accept

230V / 13A and industrial 110V / 16A plugs. When testing 110V products,
an external supply source will be required to carry out Earth Leakage and
Load Current tests. Other connector combinations can be catered for, as
optional extras and to special order.

3. Earth Return clip lead – this green clip lead is used to complete the Earth

Continuity test path when testing Earthed (Class 1) equipment – the lead is
not required when testing Double Insulated (Class 2) equipment.

4. Flash Test Probe – a high voltage safety probe for use when applying the

3000V and 3750V LN-Probe flash tests to Double Insulated (Class 2)
products – the probe is not required when testing Earthed (Class1)
equipment.

5. Fault Simulator – used to check the correct operation of the Flash test trips

and Earth Continuity measuring circuits. This simple to use device should
be used on a regular basis, even daily, to ensure that the B255 continues
to provide accurate safety test results. See under Operating Procedures for
instructions.

FIG.2 Supplied Accessories