beautypg.com

For the installer: location & assembly – Scotsman CME1202 User Manual

Page 6

background image

FOR THE INSTALLER: Location & Assembly

Stacking Instructions

A stacking kit, KSCMS48, is required to
interconnect the ice level controls, seal the
freezing compartments, and to retain the top
edges of the bottom unit’s front panels.

Follow the installation instructions of the stacking
kit, but in general:

Use heavy duty legs (kit KLP6).

When stacking two units, remove the top panel
and the evaporator cover from the lower icemaker.

(The top removed from the lower ice maker will no
longer have any function.)

A stainless steel bracket (from the kit) must be
attached to the top of the bottom machine before
the units are stacked.

Place strips of gasket material (from the stacking
kit) on the top edges of the bottom unit’s freezing
compartment.

Carefully lift the uncrated top unit onto the bottom
one and align the two cabinets. Use of a
mechanical lift is recommended for this step.

At the back of the two ice makers,
bolt the upper ice maker cabinet to
the lower ice maker cabinet using the
mounting straps and bolts from the
hardware package.

Add the relay box to interconnect the
two ice machine’s bin control circuits.

EVAPORATOR COVER

STACKING

STAINLESS STEEL PANEL

RETAINING BRACKET

CME1202 & CME1402

January 1995

Page 6

This manual is related to the following products: