For the installer: location & assembly – Scotsman CME1202 User Manual
Page 5

FOR THE INSTALLER: Location & Assembly
When alignment and leveling are completed,
tighten the bolts to secure the mounting straps.
Remove the front panels, and remove the
evaporator shipping brackets and hardware.
SHIPPING
BRACKETS
ICE MACHINE AND BIN ASSEMBLY
MINIMUM MAXIMUM
Air Temperature
50
0
F.
100
0
F.
Water Temperature
40
0
F.
100
0
F.
Water Pressure
20 psi
80 psi
OPERATIONAL LIMITATIONS
Location:
After uncrating and inspection, the unit is ready for
installation. It is important that the machine be
installed INDOORS in a location where it has
enough space around it to be accessible for
service. A minimum of 6" must be allowed at the
back for air circulation on air cooled models. Try to
avoid hot, dirty and crowded locations. Be sure
that the location for the machine is within the
environmental limitations.
Storage Bin:
Tip the storage bin on its back, using parts of the
carton to protect the exterior finish. Install the
casters, use a heavy duty leg kit if stacking two ice
machines on one bin.
1. Arrange for proper electric, water and drain.
See instructions for the plumber and for the
electrician.
2. Single ice machine on bin: Use legs packed with
the bin. After mounting the legs position the ice
storage bin in the selected location:
Two ice machines on a bin require a stacking kit
such as KSCMS48. Use heavy duty leg kit KLP6
when stacking onto the BH900.
Note: Allow enough space to the left and back to
service the machine. Do NOT push the bin into
position, instead, lift it there. Pushing a bin may
damage the legs and leg mounts.
Level the bin in both the front to rear and side to
side directions by adjusting the leg levelers.
Stacked units use non-adjustable legs, and must
be leveled with shims. Select a well ventilated
location for air cooled models.
Note: Air cooled models blow air from front to back.
3. Inspect the bin top mounting gasket which
should be flat, with no wrinkles, to provide a good
water seal when the cuber is installed on top of the
bin.
Ice Maker:
Install the modular cuber on top of the bin using
care to be sure a good seal is made between the
two cabinets. Use of a mechanical lift is
recommended. Align the holes in the bottom rear
of the cabinet to mate with the two mounting holes
on the top rear of the bin. Use bolts and straps
found on the back of the ice maker to secure the
ice machine to the bin.
CME1202 & CME1402
January 1995
Page 5