Final Check List

After connections,

1. Wash out the bin. If desired, the interior of the bin could be sanitized.

2. Locate the ice scoop (if supplied) and have it available for use when needed.

Final Check List:
1. Is the unit located indoors in a controlled environment?

2. Is the unit located where it can receive adequate cooling air?

3. Has the correct electrical power been supplied to the machine?

4. Have all the water supply connections been made?

5. Have all the drain connections been made?

6. Has the unit been leveled?

7. Have all unpacking materials been removed?

8. Is the water pressure adequate?

9. Have the drain connections been checked for leaks?

10. Has the bin interior been wiped clean or sanitized?

11. Have any water filter cartridges been replaced?

12. Have all required kits and adapters been properly installed?