Safety precautions, Unpacking and inspection, Site preparation – RGBLink DV4 User Manual User Manual
Page 27
DV4 User Manual 27
Safety Precautions
For all DV4 installation procedures, please observe the following important
safety and handling rules to avoid damage to yourself and the equipment.
To protect users from electric shock, ensure that the chassis
connects to earth via the ground wire provided in the AC power
Cord.
The AC Socket-outlet should be installed near the equipment and
be easily accessible.
Unpacking and Inspection
Before opening DV4 shipping box, inspect it for damage. If you find any
damage, notify the shipping carrier immediately for all claims adjustments.
As you open the box, compare its contents against the packing slip. If you
find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and
checked that all the listed components are present, visually inspect the
system to ensure there was no damage during shipping. If there is damage,
notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your DV4 should be clean, properly lit,
free from static, and have adequate power, ventilation, and space for all
components.