Assignment of the connection ports – REMKO KPS300 User Manual
Page 9

9
Installation may only be performed
by authorised specialists.
Preparation of the hot water
must be in compliance with the
applicable standards.
NOTE
Electric booster heater
■
Use the 6/4" socket to install an
electric booster heater (immersion
heater)
■
Please note that the electric booster
heater must not be used as a
permanent heating system.
Installation may only be performed
by authorised specialists.
NOTE
■
In hard water areas, connect
a standard descaling device upstream
of the tank.
Heat pump supply line
5/4“ AG
Heat pump return line
5/4“ AG
Heating circuit supply
5/4“ AG
Heating circuit return line and
emptying through customer-
provided T-section 5/4" AG
Optional: Electric booster
heating (immersion
heating) 6/4" IG
Immersion tube
for temperature sensor
Cleaning flange or
opening for fin-tube
heat exchanger D180
(special accessory)
Top 1" AG connection,
for: venting, safety group
Variant 1: Heat pump located to the
right of the storage tank
Assignment of the connection ports