Remko, Kps 300, Commissioning – REMKO KPS300 User Manual
Page 10

10
REMKO
KPS 300
Heat pump supply line
5/4“ AG
Heat pump return line
5/4“ AG
Heating circuit supply
5/4“ AG
Heating circuit return line and
emptying through customer-
provided T-section 5/4" AG
Optional: Electric booster
heating (immersion
heating) 6/4" IG
Immersion tube
for temperature sensor
Cleaning flange or
opening for fin-tube
heat exchanger D180
(special accessory)
Top 1" AG connection,
for: venting, safety group
Variant 2: Heat pump located to the
left of the storage tank
Commissioning
1.
Check all connections, even those
which were sealed at the factory
(flange), for leak-tightness.
2 Then check all pipes for any leaks
and, if necessary, fix them.
Commissioning should only be
performed and documented by
specially trained personnel.
NOTE
3.
Test the safety module and valves
for function.
4. During the heating process, all
expansion water generated in
the tank must be captured by an
appropriate expansion vessel.