beautypg.com

Unit dimensions and technical data – REMKO KPS300 User Manual

Page 11

background image

11

Flange installation port

Depending on the design of your
system, fin-tube heat exchangers may
be attached to the boiler flanges.

First tighten the nuts by hand.

Then tighten the nuts, in the
sequence specified below, to a
torque of 20 Nm to max. 25 Nm.

Fitting the flange installation port

Flange ring

Seal

Supporting disc

Flange plate

Unit dimensions and technical data

We reserve the right to modify the dimensions and constructional design as part of the ongoing
technical development process.

Unit type

Nominal

capacity

[l]

Operating

temperature

min/max

[°C]

Operat-

ing pres-

sure

[bar]

Tilt

height

[mm]

Weight

[kg]

Energy consumption in standby

(emission value)

according to DIN 44532

[kWh/d]

KPS 300

300

0/95

3

1740

118

2,2

246

983

1514

305

1797

ø600

90°

180

1420,5

924,5

1689