Before commissioning

Before the warm water storage tank is
connected to the mains electricity supply
and put into service for the first time, it
is vital that it is filled with water.

During the heating process, the expansion
water generated in the internal boiler
should drip out of the safety valve if there
is a pressure-tight connection, and out
of the overflow mixer tap if there is an
unpressurised connection.

Commissioning

During initial filling, the discharge valve
must be open. The warm water storage
tank is fully filled, when water flows out of
the discharge pipe without any bubbles.

Once the water has been heated
successfully, the set temperature,
the actual temperature of the water
produced and the temperature shown
on any temperature indicator should be
approximately the same.

Commissioning may only be

performed and documented by

specially trained personnel.

NOTE

Heating the water in the buffer storage
tank causes its volume to increase.
During the heating process, the
expansion water generated in the internal
boiler must drip out of the safety valve.
This dripping is part of the the function
and may not be prevented by tightening
the valves.

Check the automatic shutdown of the
installed flange heating cartridge.

!

CAUTION

The warm water drain pipe as well
as safety equipment components
may become hot.

!

CAUTION

The warm water drain pipe as well
as safety equipment components
may become hot.