REMKO PG 12 User Manual
Page 6
![background image](https://www.manualsdir.com/files/802331/content/doc006.png)
6
Press down pin (2) of thermoelectric
gas valve (safety pilot).
Put the operating switch into po-
sition "O"(= Off) and plug the
mains into an appropriate mains
socket with
fault current safety
switch
(230V/1~ 50 Hz).
Close all the bottle valves.
Let flame burn out.
The fan should still run for a few
seconds to exhaust the accumu-
lated heat.
Put operating switch (1) into “0”
position (= off) and unplug mains
plug from the mains socket.
'
# % ( )
Important Hints!
Make sure that the supply air can be freely sucked
and the heated air can be blown off without prob-
lems.
The suction and blower apertures of the unit may
not be narrowed or equipped with hoses or condu-
its.
Make sure to keep the safety distance from com-
bustible and inflammable materials and to observe
the local fire protection codes.
After approx. 2 or 3 sec. the piezo
igniter (3) is to be actuated (possibly
several times) with the pin (2) still
held down, until a formation of flames
has occured.
Put the operating switch into "I"
position (= heating operation)
The supply air fan starts.
After the formation of flames still hold down the pin (2)
for approx. 10 - 15 seconds, until the thermoelectric
flame monitoring has started.
Do not release the pin before this.
If the flame is extinguished after the pin has been re-
leased, repeat the ignition procedure after having wai-
ted for approx. 1 minute. Then keep the pin pressed
down a little longer.
Important!
Make sure to place gas reservoir only laterally behind
the unit! Never heat up or defrost gas reservoir through
the unit’s hot air current (
danger of explosion!
).
Never use gas reservoir in a lying position when the u-
nit is operating (gas leakage in the liquid phase).
Assembly of Multi-bottle Set
To avoid intensive icing of the gas bottle during a lon-
ger operation of the unit, we recommend that you use a
bottle battery consisting of at least 3 bottles. All bottle
valves must be open to ensure regular gas supply!
The electric connection of the unit is to be carried
out according to the VDE 0100 regulations
§ 55, via a special supply point with fault current
safety switch.
2
3
1
1
1
T-connection
high pressure hose 0.4 m
pressure controller
hose-break protection
gas hose to unit