beautypg.com

REMKO RKL 220 User Manual

Page 14

background image

14

Any claims under guarantee regarding materials can be accepted only when the orderer or his customer has

filled in completely the “guarantee certificate” which is enclosed with every REMKO unit and has

returned it to REMKO GmbH & Co. KG in due time after the unit’s sale and commissioning.

Wall Lead-Through Kit RKL 220/240

Installation instructions

1. Create a core hole in the outer wall (maximum wall thickness 480 mm) with a diameter of at least 125 mm.

Pay attention to possible supply lines in this area!

2. Insert the telescope pipe in the wall lead-through that you created so that the outer pipe (100 mm diameter) is on

the inner side of the wall.
To prevent cold bridges, insulate the telescope pipe with a suitable insulation material.

3. Place bricks around the telescope pipe in the core hole so that it is aligned with both sides of the wall.

4. Attach the safety guard to the outer side of the wall with 4 screws.

Mount the safety guard paying attention to the position of the rain drainage.

5. Insert the back pressure flap inside and attach it with 4 screws as well.

The “oben” label on the back pressure flap must be visible from inside!

6. Close the opening on the back pressure flap with the sealing cap when taking the unit out of operation, e.g. be-

fore winter, to prevent air circulation.

Safety guard (outside)

Back pressure flap

Sealing cap

Telescope pipe

min. 425 mm

Operation/handling which does not comply with these instructions is prohibited!

In cases of non-compliance, we assume no liability and the guarantee becomes null and void.

This manual is related to the following products: