BEFORE YOU START

Complete following prior to installing boiler.

A. Verify you have selected right size boiler with proper

capacity. AHRI rating of boiler selected should be

greater than or equal to calculated peak heating load

(heat loss) for building or area(s) served by boiler

and associated hot water heating systems. See boiler

rating and capacity table previously listed. Any heat

loss calculations used should be based on approved

methods.

B. Supply boiler with proper oil supply and oil piping,

sufficient fresh combustion air, and suitable electrical

supply.

C. Connect boiler to suitable venting system and piping

system adequate to distribute heating load.

D. Thermostat must be properly located and installed for

control of heating system.

If there are any doubts as to requirements, check with lo-

cal authorities and obtain professional help where needed.

Operating Instructions, Checks And Adjustments, And

Maintenance sections in this manual are vital to proper and

safe operation of heating system. Take time to be sure they
are all done.

BOILER LOCATION

1.

Place boiler in location centralized with piping system

and as close to chimney as possible.

2.

Boiler must be level. If necessary use metal shims

beneath boiler’s feet.

3.

Use raised base if floor can become wet or damp.

4.

Maintain clearances for fire safety as well as

servicing. Maintain 18” clearance at a side where

passage is required for access to another side for

cleaning, servicing, inspection, or replacement

of any parts that normally may require such

attention. Boilers must be installed at least 6” from

combustible material on all sides and above. Allow at

least 24” front clearance for servicing.

5.

Allow fresh air for combustion at front of boiler.

Allow fresh air for ventilation to front and rear of

boiler. Air passages must be free of obstructions at

all times. Ventilating and combustion air must enter

boiler room without restrictions.

WARNING

Fire hazard. Do not install boiler on combustible

flooring or carpeting. Failure to follow these

instructions could result in death or serious injury.

!

6.

Floor supporting boiler must be noncombustible and

sufficiently stable. If flooring is combustible, place

boiler on 2” concrete patio blocks or 2” Cladlite

Pad™. Blocks or pad must be under entire boiler to

protect floor.

7.

Be sure installation is in accordance with the

requirements of the local authorities having

jurisdiction. Compliance with these regulations is

required. In the absence of local codes, follow NFPA

31 Installation of Oil Burning Equipment, latest

revision.

BOILER CLEARANCES

Unit

Combustible

Clearance

Accessibility,

Cleaning, and

Servicing

Flue to

Combustible

Clearance

Top

6”

18”

18”

Right Side

24”

24”

Left Side

6”

Base

Non-combustible

Front

24”

Back

6”

All distances measured from the cabinet of the boiler.

24” Min.

6”

Min.

6”

Min.

24” Min.

Boiler

Front

MINIMUM CLEARANCE DIMENSIONS

BEFORE YOU START

Figure 2 - Clearances