beautypg.com

Warning – Pennco 3KW0.60 User Manual

Page 17

background image

17

THERMOSTAT
Install 24 Volt thermostat (not provided) in proper location.

Location of thermostat has effect on boiler system operation.

Follow instructions included with thermostat.

GROUNDING
Permanently ground boiler according to local codes and

latest revision of the National Electrical Code. Run 14

gauge or heavier copper wire from boiler to grounded

connection in service panel or properly driven and

electrically grounded ground rod.

ELECTRIC POWER SUPPLY
Installation must comply with the latest revision of the

National Electrical Code, any other national, state, or local

codes or regulations.
Connect 115 volt electrical supply to L1 and L2 terminals

on limit and two thermostat wires to T and T terminals on

same limit. See wiring diagrams, pages 28 & 29.
Run separate circuit from separate over current protection

device in your electrical service entrance panel. Minimum

15 ampere circuit. Locate shutoff switch at boiler. Turn off

during any maintenance. Solder and tape or securely fasten
connections with wire nuts.

OIL BURNER WIRING
For boilers packaged with oil burners, burners are factory

wired.

ELECTRICAL CONNECTIONS

WARNING

Electrical shock hazard. Turn OFF electrical power sup-

ply at service panel before making electrical connections.

Failure to do so could result in death or serious injury.

!

This manual is related to the following products: