Online power, Danger – OnLine Power Iso-Care User Manual
Page 20
OnLine Power
6002-033 Rev C
5-1
SECTION 5 - MAINTENANCE
5-1 PERIODIC
MAINTENANCE
When to Perform
Perform Periodic Maintenance (PM) every sixth month after installation according to following procedure.
How to Perform
Periodic Maintenance must be accomplished with top cover, front and rear panels removed.
Perform a complete cleaning and inspection as described in the following procedure.
Tools Required
• Common electrician tools
• Vacuum cleaner with hose
PM Procedure
DANGER!!
DISCONNECT INPUT POWER TO ISO-CARE OR NRT BEFORE PERFORMING PERIODIC
MAINTENANCE.
1.
Turn OFF all the units or equipments connected to the Iso-Care or NRT.
2.
Turn facility circuit breaker OFF, lock and tagout in accordance with OSHA Lockout/Tagout requirements.
3.
Remove top cover by unbolting two screws on each side of cover.
4.
Remove front and rear panels by unbolting six screws at corners and at left and right sides of each panel.
5.
Clean dust from all interior surfaces of unit.