beautypg.com

Nortec ME Control Installation User Manual

Page 40

background image

40 Installation

Connecting the 14-core inter-connecting cable from the hydraulic module

K2

X4

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Level Sensor 1

GND Pumps 4&5, Drain & Sensor

GND Pumps 1,2&3 VCC Pumps 1,2&3

VCC Pumps 4&5

Signal Pump 4 Signal Pump 2 Signal Pump 1 Signal Pump 3 Signal Pump 5

Signal Drain Pump

VCC Drain&Inlet Valve

GND Drain Valve GND Inlet Valve

Control unit

The 14-core inter-connecting cable “K2” from the hy-

draulic module is to be connected according to the

wiring diagram to the terminals “X4”. The 14-core inter-

connecting cable must be fed through the rectangular

cable feed through into the control unit.

Note: The 5 m inter-connecting cable has to be cut to

length on site.

Connecting the remote operating and fault indication (option)

H1

Error

1 2 3

Service

4 5 6

Running

7 8

Unit On

9 10

Control unit

The optional remote operating and fault indication board

contains four potential-free relay contacts for the con-

nection of the following operating and fault indications:

– “Error”:

This relay is activated if an error is present.

– “Service”:

This relay is activated when the set service interval

has expired.

– “Running” (Humidification/Cooling):

This relay closes as soon as the Nortec ME is hu-

midifying/cooling.

– “Unit on”:

This relay closes as soon as the voltage supply to the

control unit of the Nortec ME is switched on.

The connecting cable must either be fed through the

rectangular cable feed through or a free cable gland into

the control unit.

The

maximum contact loading is 250V/8A.

Appropriate suppressor modules are to be used for the

switching of relays and miniature contactors.