Nortec ME Control Installation User Manual
Page 16
16 Installation
3. Fix frame to the tank:
• Fix the vertical supports to the tank using the nyloc nuts (M6, AF: 10 mm) and M6 washers. Then,
align the vertical supports exactly vertical using a level and tighten the nuts.
• Fix the cross member to the vertical supports using the nyloc nuts (M6, AF: 10 mm) and M6
washers. Then, tighten the nuts.
Fig. 6: Fix frame to tank
See also other documents in the category Nortec Equipment:
- HumDigital (28 pages)
- NHDI Nortec OnLine (16 pages)
- SynPur (37 pages)
- Steam Distribution (15 pages)
- DRAABE Pure Water System (59 pages)
- AIRFOG Series (48 pages)
- NHDI Resistive Element (40 pages)
- LiveSteam v.1 (38 pages)
- OnLine NHRS (24 pages)
- SAM-e (62 pages)
- HP Series (76 pages)
- LINKS 2 SETC (50 pages)
- Outdoor Temperature Sensor (2 pages)
- Off Digital Wall Humidistat (4 pages)
- LINKS 2 SC (44 pages)
- Off Digital Duct Humidistat (4 pages)
- BLOWER PACK For RH Series (6 pages)
- Outdoor Mount Temperature Sensor (2 pages)
- SETC Outdoor (32 pages)
- Off Digital Wall & Duct Humidistat (6 pages)
- 2-10 V Wall & Duct Humidity Sensor (6 pages)
- Steam Distributors (16 pages)
- SE Series (100 pages)
- MES2 (54 pages)
- LINKS XPS SETC (68 pages)
- LINKS 2 GSTC B+ (23 pages)
- Modbus (52 pages)
- RH2+ (62 pages)
- Blower Packs (31 pages)
- LONWORKS (36 pages)
- Remote Interface (34 pages)
- NH-EL Series (99 pages)
- ME Direct Feed (40 pages)
- ME Control (76 pages)
- MLP RO pump station (12 pages)
- Air Humidification System BS (30 pages)
- ME Direct Feed Installation (48 pages)