beautypg.com

Nortec Blower Packs User Manual

Page 11

background image

Blower Pack Installation Guide | 8

Keyholes are spaced 12 in. (30.48 cm) apart center to center. Insert screws into the studs until

there is 1/4 in. (0.64cm) of screw exposed. Be sure the screws are level to each other.

Raise the unit and place the screws through the keyholes. Make sure the unit is level, then

tighten the screws to secure the unit in place.

Place L Shaped brackets on top of the unit, with holes inline with the studs. Using the

appropriate sized wood screw, fasten the “L” brackets to the studs, securing the unit from any
upward motion

Note: Use screws longer than 3/4” (7.5 cm) if drywall or other spacer is present.

Note: Do not mount on hot surfaces, where freezing can occur, vibrating

surface, or floor.

Figure 7. RM-BP Mounting Detail