Metro Mobile Computing Workstations MPS-3111 Series Sealed Lead Acid Power Supply User Manual
Page 28

28
Metro
TM
MPS-3111 Series SLA Power Supply Operations Manual Supplement
InterMetro Industries Corporation
11. Place the new battery inside the MSLA power system. Make sure to line up the holes on the
carrying handle with the screw posts on the bottom of the power supply case.
12. Plug the wiring harness into the logic board.
Plug the Battery Harness In
13. Replace the nuts that were removed in step 4, being careful not to damage any of the circuit
boards.
14. Replace the top cover that was removed in step 3. Make sure all four screws are started
before tightening down and, paying attention to the handles and fuel gauge label, ensure the
cover is placed in the direction shown below.
Placement of the Lid Cover on the Power Supply Case
15. Install the Power Supply back onto the workstation base: (See “Mounting the MPS-3111
Power Supply” above).
16. Charge the new battery fully before placing back in service: (See “Charging the Power
Supply Battery” under “Getting Started” above).
Storage and Transport Conditions
Environmental conditions for shipping and storage are:
• Ambient temperature range of -40°C to +70°C (-40°F to 160°F).
• Relative humidity range of 10% to 100%.
• Atmospheric pressure range of 14.76 in. Hg to 31.29 in. Hg.