Appendix – MEGA Corp. MSC-OPS-1 User Manual
Page 54

MSC/MST-OPS-1
31 Dec 2013
SECTION 7
Appendix
7-11
MSC/MST-OPS(CL)-1
31 Dec 2013
Once operations are complete:
7. FOAM Switch – OFF
8. Water Cannon – Flow water through the water
cannon nozzle with the FOAM switch off to flush
foam from the nozzle.
9. MONITOR/BFV Switch – OFF
10. Water Cannon Nozzle - STOW
Manual and remote adjustable nozzles must be
stowed pointing vertically to reduce wear on
water cannon joints. Leaving the nozzle in any
other position will cause increased wear on water
cannon joints and result in premature joint
failure.
11. PUMP Switch OFF
Engaging/disengaging the water pump above
LOW IDLE may result in water pump component
damage and reduced service life.
12. Cab Control SYSTEM/POWER Switch – OFF
N-10
This manual is related to the following products: