BEFORE TRANSPORTING MMP4

These procedures are used to perform a walk-around
inspection on the MMP4 prior to transporting the unit.

1. Ensure unit is safe for operation.

2. Engine – STAR/RUN, LOW IDLE

3. Lift INTAKE Boom - COMPLETED

4. Remove INTAKE Boom Flange Bolts – REMOVED

AND SECURED

5. Install and secure INTAKE Boom Travel Straps,

Safety Chains, Chains and Bolts – CHECKED AND
SECURED

6. Lift and Preload Discharge cylinder, release safety

chain - COMPLETED

7. Lower DISCHARGE Boom- LOWERED

8. Remove DISCHARGE Boom Flange Bolts –

REMOVED AND SECURED