beautypg.com

Appendix – MEGA Corp. MMP4-1 User Manual

Page 25

background image

MMP4(T2)-OPS-1

4 Oct 2011

SECTION 4

Appendix

4-3






MMP4(T2)-OPS(CL)-1

4 Oct 2011

BEFORE OPERATIONS

These procedures are used to perform a walk-around
inspection of the MEGA mobile water pump before
use or beginning of the shift. This inspection is in
addition to and does not replace the vehicle
manufacturer’s inspection requirements.

1. Chocks – As Required

2. Landing Gear – Secure and Stabile

3. Engine Control Switches – SET OFF

4. Boom Safety Chains – SECURE AND

PROPERLY ADJUSTED

5. Hydraulic Oil Tank – CHECKED AND

SECURED

6. Hydraulic Oil Level - SERVICED

7. Hydraulic Oil Quality – CLEAR

8. Ball Valve On hydraulic Tank – OPEN

9. Hydraulic Hoses and Fittings – SECURE AND

NO LEAKS PRESENT

N-2