Appendix – MEGA Corp. MMP4-1 User Manual
Page 25

MMP4(T2)-OPS-1
4 Oct 2011
SECTION 4
Appendix
4-3
MMP4(T2)-OPS(CL)-1
4 Oct 2011
BEFORE OPERATIONS
These procedures are used to perform a walk-around
inspection of the MEGA mobile water pump before
use or beginning of the shift. This inspection is in
addition to and does not replace the vehicle
manufacturer’s inspection requirements.
1. Chocks – As Required
2. Landing Gear – Secure and Stabile
3. Engine Control Switches – SET OFF
4. Boom Safety Chains – SECURE AND
PROPERLY ADJUSTED
5. Hydraulic Oil Tank – CHECKED AND
SECURED
6. Hydraulic Oil Level - SERVICED
7. Hydraulic Oil Quality – CLEAR
8. Ball Valve On hydraulic Tank – OPEN
9. Hydraulic Hoses and Fittings – SECURE AND
NO LEAKS PRESENT
N-2