System operation – MEGA Corp. MMP4-1 User Manual
Page 21

MMP4(T2)-OPS-1
4 Oct 2011
SECTION 3
System Operation
3-7
38. When the discharge boom has reached the
full UP angle move the lever to the neutral
position.
39. Secure the discharge boom safety chain.
40. Ensure the safety chain is tight, the safety
chain shear pin is fully seated and the safety
keeper pin is installed.
Ensure the safety chains are tensioned
properly and shear pins and keepers are
installed. Failure to ensure the safety
chains are installed and secured properly
may result in serious personal injury or
death if the boom falls.
41. Tighten the Victaulic coupling bolts and
pipe mounting bolts that were previously
loosened for tube movement.
42. Return the engine to LOW idle.
43. Shut off engine.
44. Stow and secure the travel lock bolts and
hardware
in
the
battery
box
tool
compartment.
45. Secure engine control box.
OPERATING THE MMP4
1. Move water tanker into position with the
fill port directly under the discharge boom
fill sock.
2. Check engine according to the CAT 3054
Operations and Maintenance Manual for
pre-operation checks.
3. Ensure the unit is safe to operate.
4. Start engine.
5. Let engine idle to stabilize oil pressures and
temperatures.
6. Engage the MMP4 water pump.
7. Move the PUMP lever to the ON position
as shown below (a detent will hold the lever
it the ON position until it is physically
moved to OFF).