beautypg.com

Insinger Ensign 40-2 User Manual

Page 10

background image

®

www.insingermachine.com 800-344-4802

8

PART 2 INSTALLATION INSTRUCTIONS

Initial Start-Up Adjustments

Tank Overfill Adjustment
1. Locate tank overfill timer in the control panel.

See the control panel layout drawing located in

Section 4, Electrical Schematic and Replacement

Parts.

2. The overfill timer starts timing when the upper

level float is actuated. Adjust the overfill timer

potentiometer to turn the tank fill solenoid off

when the water level is 1/4” below the lip of the

overflow tube.

3. The timer has a built in dwell timing delay of 5

seconds (nominal to dampen float bounce caused

by tank water motion).

Final Rinse Pressure Adjustment
1. The final rinse pressure must be adjusted to

20PSI. This is done by adjusting the pressure

regulator.

Ensign_40-2_TM2009