Evaporative cooling n/a, Electric heat pre post n/a, Electric heater 1 pre post n/a – Greenheck Energy Recovery and Make-Up Air Start-Up Report User Manual

Page 6

background image

6

Evaporative Cooling

N/A

Direct

Indirect

For units with ship loose evap section, complete wiring per unit wiring diagram.
Connect overflow line (run bleed line into overflow)
Install trap
Connect drain line
Connect water supply line
For units with auto drain & fill with freeze protection
Install, wire and provide power to components
Confirm temperature and timer settings
Pump filter is clean and installed properly
Saturate media per IOM
Adjust bleed-off rate per IOM
Check for water carryover
Connect “call for cooling” signal
Remove jumper wire

Comments:

Electric Heat

Pre Post N/A

Model:

Serial #:

Staged Control

Modulating Control

Voltage:

# of elements:

Fuses:

Total KW:

Total AMPS:

L1:

L2:

L3:

Heater Control:

BAS

Signal type:

Internal controller:

Comments:

Electric Heater 1

Pre Post N/A

Model:

Serial #:

Staged Control

Modulating Control

Voltage:

# of elements:

Fuses:

Total KW:

Total AMPS:

L1:

L2:

L3:

Heater Control:

BAS

Signal type:

Internal controller:

Comments: